Carbon Index — Configure Carbon Profiles, Baselines & Rule Sets

The Configuration engine provides centralized management of carbon estimation parameters, project Gross Internal Area (GIA) baselines, lifecycle study periods, and automated material mapping rule sets. Profiles can be locked as corporate standards or customized for specific client requirements and building typologies.


Configuration Workspace Layout

Configuration Profile Builder Interface

The Configuration interface is organized into three primary sections:

  1. Profile Selector & Management Bar: Switch between available profiles, clone existing profiles, create new custom profiles, or save changes.
  2. Project Metadata & Baseline Parameters: Configure building-level assumptions such as Gross Internal Area (GIA), study period, and assessment purpose.
  3. Automated Mapping Rule Set Table: Review, add, edit, or remove pattern-matching rules that automatically assign materials and EPDs during harvest.

Profile Architecture: Locked vs. Project Profiles

Carbon Index distinguishes between two profile tiers:

Profile Tier Badge Modifiable Purpose
System Default Profile (Default) / Locked No Certified baseline incorporating standard ICE v3 material factors and RICS defaults. Guarantees a clean, uncorrupted baseline is always available.
Project Custom Profile Custom Yes Specific to an individual iTwin project or organization. Stores custom EPD overrides, project GIA, and tailored regex mapping rules.

Project Baseline Parameters

Parameter Name Default Value Description
Gross Internal Area (GIA) 1,000.0 m² Total enclosed floor area measured inside external walls. Crucial denominator used to calculate carbon intensity ($kgCO_2e/m^2\ \text{GIA}$).
Reference Study Period 60 Years Standard building design life per RICS WLCA and BS EN 15978 guidelines.
Design / Assessment Stage Stage 3 - Spatial Coordination Current project maturity stage (e.g. RIBA Stage 2 Concept, Stage 3 Coordination, Stage 4 Technical Design).
Building Typology Commercial Office Typology benchmark category (Commercial, Residential, Education, Healthcare, Infrastructure).

Automated Mapping Rules Builder

The Mapping Rules table controls how the harvesting engine interprets raw BIM element strings:

Mapping Rules Table

Rule Properties:


Rule Precedence & Execution Order

During the Harvest & Calculate Carbon sequence, rules are evaluated in the following order:

  1. Instance-Level Manual Overrides: User-specified element overrides take highest precedence.
  2. Exact Source Pattern Rules: Direct matching rules configured in the active profile.
  3. Pattern / Regex Rules: Wildcard rules evaluated from top to bottom.
  4. Heuristic Keyword Matcher: Built-in fallback analyzing material strings against the 30+ CI Canonical material categories.
  5. Unlinked Fallback: Elements with no matches are marked as UNLINKED for user review.

Related Documentation